The European Investment Project Portal (EIPP) was established by the European Commission in order to provide greater transparency about EU investment opportunities. It is part of the Investment Plan for Europe and is designed to support investment in the real economy. The Portal offers EU based private and public project promoters a convenient way to boost the visibility of their investment projects by simply filling and submitting a project form. EIPP will show-case these projects in a structured user-friendly way and will thus attract investors worldwide, who will be able to reinforce their own pipelines with more European projects
extraction made 18 May 2017
Shipbuilding
20160214 1200 PASSENGER ELECTRICALLY PROPELLED VESSEL
Transport
Ibvestmen tproject20160068 Acquisition of new maritime tonnage by "Cosmos Shipping" AD through the purchase of bulk carriers
20160037 A.I.R.SEA.NET. (Advanced Integrated Regional SEAplane NETwork)
20160068 Acquisition of new maritime tonnage by "Cosmos Shipping" AD through the purchase of bulk carriers
20160189 Building and Construction of Multimodal Terminal in Freeport of Riga area, Latvia
20160189 Building and Construction of Multimodal Terminal in Freeport of Riga area, Latvia
20160081 Alexandroupolis – Ormenio
20160211 Darsena Energetica Grandi Masse (DEGM)
20160014 Helicopter Search and Rescue (SAR) Training and Coordination Center
20160217 Port of Thessaloniki: Construction of Dry Bulk Terminal
20160216 Port of Thessaloniki: Container Terminal Expansion
20160196 The Skulte LNG Terminal — a liquefied natural gas import terminal
20160018 VOOPS Venice Offshore Onshore Port System
20160215 Venice Cruise 2.0 - New Venice Cruise Terminal at Bocca di Lido
20160100 Water Airports Network
20160060 VARNA Connect
20160210 BioMovLNG
Subsea Engineering
20160097 Undersea Road Tunnel Salamina island – Perama
20160041 Interconnector between Estonia and Finland (BalticConnector)
Bioeconomy
20160070 ALGAEPRINT - ALGAE PRODUCTS INTERNATIONALIZATION I
20160069 Eight Seas ictoSphere: Onshore, closed-containment RAS salmon farm
Energy
20160109 Desalination - Water Supply and Sewerage Infrastructure
20170254 FloatMast
20160213 LNG motion
21 December 2016 (but more detailed)
Title |
MS |
Description |
Estimated project cost (MEUR) |
Start date |
Status |
Varna Connect |
BG |
A complex infrastructure intermodal project to process and redirect cargoes |
432.05 |
04/2019 |
Pre(feasibility) Insufficient funding |
Eight Seas ictoSphere |
DE |
Planning, building and operation of onshore aquaculture projects (Atlantic Salmon) |
25 |
10/2016 |
Structuring The only remaining bottleneck is the pre and interim financing |
Tallin LNG |
EE |
Conventional LNG import terminal for serving commercial customer and improving Baltic as well as Finnish security of supply |
250 |
01/2017 |
Structuring |
Alexandroupolis – Ormenio |
EL |
Design, construction, financing, operation, maintenance and exploitation of Alexandroupolis ports with rail and road connection to Ormenio. |
276 Incl.55 for the port development |
03/2018 |
Structuring Pending introduction to the national parliament of relevant legislation. |
Desalination –water supply and sewerage infrastructure |
EL |
Construction of new desalination plants in 11 islands and 1 one coastal area in the mainland Construction of new wasterwater treatment plants (biological) in 22 islands settlements and reconstruction of sewerage network. |
125 |
03/2017 |
Structuring Pending introduction to the national parliament of relevant legislation. |
Lavrio-Koropi-Athens airport |
EL |
Design, construction, financing, operation, maintenance and exploitation of Lavrio port with rail and road connection to Koropi and Athens airport. |
285 |
03/2018 |
Structuring Pending introduction to the national parliament of relevant legislation. |
North Road Axis and ports of Crete |
EL |
Among others, port, terrestrial works for multiuse station in cruise part of Souda port, upgrade of pier at Heraklion port and operational upgrade of Rhodes port. |
1748 |
10/2018 |
Structuring Pending introduction to the national parliament of relevant legislation. |
Port of Thessaloniki |
EL |
Construction of dry bulk terminal |
144.4 |
01/2018 |
(pre)feasibility study. EIA submitted for approval to responsible ministries |
Port of Thessaloniki |
EL |
Container terminal expansion |
190.9 |
09/2017 |
(pre)feasibility study. EIA submitted for approval to responsible ministries |
Undersea Road Tunnel Salamina Island-Perama |
EL |
Works include construction of an undersea tunnel and a touristic marine, multi-theme park |
350 |
06/2018 |
Procurement Finalisation of the design EIA still to be approved Archaeological licensing surveys to take place |
Western Peloponnese railway, ports and roads |
EL |
A multimodal transport project including, among others, the upgrade of existing ports |
850 |
10/2017 |
Structuring Pending introduction to the national parliament of relevant legislation. |
Algaeprint |
ES |
Market uptake and internationalization of the activities of a biobased company, AlgaEnergy. |
15 |
10/2007 |
Facilities in place, 80% of the financing is secured. Need for another 3-4 MEuro to boost the business plan. |
BalticConnector |
FIN |
Onshore and offshore gas pipelines between the 2 countries |
250 |
09/2019 |
Structuring Waiting for EU grants |
BalticConnector |
FIN EE |
Onshore and offshore gas pipelines between the 2 countries |
250 |
12/2020 |
Structuring Financing problems |
BioMovLNG |
FR |
Construction of 6 LNG fuelling stations dedicated to Heavy Duty Vehicles with installation of a Biomethan production unit at a Waste Water Treatment Plant. The project will favour locations in nodes and intermodal connections, so as to be serviced from the Marseille-Fos, Barcelona or Zeebrugge methane terminal. |
11 |
02/2015 |
Procurement but regulatory envi issues, complexity of technology and taxation |
Frioul Islands |
FR |
Restoration of the hangar (a former military warehouse to store anti-submarine nets) into an artistic and Ecolab center |
10 |
04/2017 |
Structuring |
FAB (France-Alderney-Britain) |
FR UK |
Submarine and underground electricity connector between FR and the UK via Alderney |
850 |
01/2018 |
Procurement Raising finance is still a problem |
Electrically propelled vessels |
IT |
Construction of 6 vessels with low environmental impact, suitable to carry 1200 people inside Venice Laguna for 1 hour trip. |
54 |
05/2017 |
Pre(feasibility) Waiting for final approval of Min of Env. + EIA assessment ongoing |
VOOPS Venice Offshore Onshore Port System |
IT |
Construction of offshore terminal for energy and container. |
2197 |
01/2018 |
Structuring |
Venice Cruise 2.0 |
IT |
Design and build of a new cruise terminal capable of accommodating up to 5 large ships. The terminal is to be fully removable. |
144 |
05/2017 |
Pre(feasibility) Waiting for final approval of Min of Env. + EIA assessment ongoing |
National Logistics IT platform |
IT |
Design and implementation of a port community system on a national scale |
60 |
01/2017 |
Procurement |
The Skulte port LNG Terminal |
LV |
To construct a low-cost LNG import terminal with a direct pipeline connection to an underground gas storage facility. |
150 |
01/2017 |
Structuring Consent from landowners is still needed and involvement of major consumer in the project is to be achieved |
Hotel Baltic Spa |
PL |
Exclusive 5-star hotel with wellness and spa area on the Baltic coast. |
49 |
08/2016 |
Pre(feasibility) |
Braila |
RO |
To arrange a container terminal or a bulk-carrier dock on the Danube, between Vienna and the Black Sea. |
10 |
04/2016 |
Not available |
PCI Gothenburg LNG terminal |
SW NW |
The LNG terminal will form part of the small scale LNG supply chain to use LNG as a bunker fuel for the maritime market contributing to the sustainability. |
100 |
01/2020 |
Procurement |